Items
Product
A32X - KORRY BLOCK FROZEN
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 0.01667 GBP | |||||
| ⋮ | process | 0.01667 GBP |
Production time:10 s
Total time for cost calculation:10 s
Total cost:0.03333 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 0.01667 GBP | |||||
| ⋮ | process | 0.01667 GBP |