Items
Product
A32X FLOOD FO - PCB ASSEMBLY
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 7 GBP | |||||
| ⋮ | process | 3.5 GBP |
Production time:45 m 0 s
Total time for cost calculation:45 m 0 s
Total cost:10.5 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 7 GBP | |||||
| ⋮ | process | 3.5 GBP |