Items
Product
PROLine Side Stick FNPTII FO
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 100 GBP | |||||
| ⋮ | process | 20 GBP |
Production time:6 h 0 m 0 s
Total time for cost calculation:6 h 0 m 0 s
Total cost:120 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 100 GBP | |||||
| ⋮ | process | 20 GBP |