Items
Product
Floor FNPTII
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 2000 GBP |
Production time:100 h 0 m 0 s
Total time for cost calculation:100 h 0 m 0 s
Total cost:2000 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 2000 GBP |