Items
Product
A32X - PROLine - FWD OVERHEAD PACKAGE
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 160 GBP |
Production time:8 h 0 m 0 s
Total time for cost calculation:8 h 0 m 0 s
Total cost:160 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 160 GBP |