Items
Product
A32X - MCDU - TOP BLOCK FROZEN
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 0.23333 GBP |
Production time:1 m 0 s
Total time for cost calculation:1 m 0 s
Total cost:0.23333 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 0.23333 GBP |