Items
Product
A32X - ATC - TOP FRAME
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 0.7 GBP | |||||
| ⋮ | process | 0.7 GBP |
Production time:6 m 0 s
Total time for cost calculation:6 m 0 s
Total cost:1.4 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 0.7 GBP | |||||
| ⋮ | process | 0.7 GBP |