Items
Product
OVERHEAD PSU KIT
Operation steps
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 12 GBP |
Production time:1 h 0 m 0 s
Total time for cost calculation:1 h 0 m 0 s
Total cost:12 GBP
Product
| Operation | Type | Resource | Cost parameter | Time | Cost | ||
|---|---|---|---|---|---|---|---|
| ⋮ | process | 12 GBP |